System Test Verification Results
TEST VERIFICATION RESULTS
Nine System Test Plans (STPs) were executed to demonstrate that elements of the Connecting the West system operate as they were designed to. Each STP consisted of a series of Test Cases focused on details of the relevant Test Plan, with a total of 32 Test Cases. Since each of the Connecting the West states have independent central systems managing their V2X deployments, many of these Test Cases were executed in each state. A few Test Cases were applicable to only one or two of the states. Details of the STPs and Test Cases can be found in the Operational Readiness Plan (ORP).
TEST VERIFICATION RESULTS DOCUMENTS COMING SOON